Regular 4-Year UGC B.Tech · Verified
Promising open-source and early-internship ethos inside Bangalore, though still a newer entrant with smaller graduating track records.
Overall Score
Grade B+
4-Year Total Cost
₹16L – ₹19.8L
Entrance Test
PAT
Internships
Work-Integrated Projects from Year 2 + Year 4 Residency
Weighted across degree safety, tech curriculum, internship stipends, 4-year cost value, mentorship, and campus life.
Includes tuition, residential hostel, mess, and degree fees.
4-Yr Tuition
₹11.5L – ₹14L
Hostel & Mess
₹4.5L – ₹5.8L
Bangalore living and PG/hostel expenses tend to push real outlay toward ₹18L–₹19.8L.
Yes — Partner NBFCs and UGC university fee letters supported.
4-Year Integrated B.Tech in CSE (AI & ML) issued by Medhavi Skills University / UGC-Approved Partner Framework. Structured as a 4-year UGC-recognized B.Tech CSE track—verify final university transcript wording during admissions counseling.
Linux, Git, Core Programming & Web Engineering
DSA, Backend APIs & Open-Source Fellowships
Distributed Systems, AI Engineering & Product Labs
Industry Residency & Full-Time Offers
PAT (Polaris Admission Test)
Tech Aptitude + Coding Logic + Founder/Mentor Interview
Moderate-to-selective cohort sizing (~150–250 seats) focused on hands-on builders.
Admissions, entrance test patterns, scholarship eligibility, and verified official portals.
3-stage evaluation focusing on math, logic, and problem-solving aptitude.
Online PAT Logic Assessment
Mini Project / Problem Sprint
Founder & Engineering Leadership Interview
Class 12th PCM with min 50% aggregate
Format: Online Coding & Logic Challenge
Test Highlight:
Moderate-to-selective cohort sizing (~150–250 seats) focused on hands-on builders.
Scholarship Grant
Up to 75% Tech Talent Grant
Official Application Fee
₹750 (100% Free with our waiver code)
Enter this code on the application fee checkout screen for an instant 100% waiver.
Verified Direct Official Application Link
Because Polaris launched recently with compact cohorts, full 4-year placement medians remain projections rather than multi-batch audited history.
Consider another option if:
Launch a side-by-side specification table against alternatives.